Lebanon Landfill Gas Flare and Blower Station
Scope of Work: Furnish and installation of a new flare and blower system for burning of the methane gas of …
Franklin Landfill Closure
Scope of Work: 12.5 Acre Ash landfill closure Regarding of subgrade Installation of a HDPE geomembrane liner & geocomposite Furnished …
Moretown VT Landfill Phase 1 Borrow
Scope of Work: 30,000 yd3 mass excavation Blasting & crushing material Slope grading with rock Methan gas upgrades to landfill Fusion-welded …
Moretown Landfill Temporary Cap
Scope of Work: 5-acre surface preparation SLope diversion ditches Anchor Trenching Finish Grade