Black Mountain Road Gravity Sewer
Scope of Work: 640 LF sleeve and Fused PVC carrier pipe under I91, Sargent Brook and Locust Cemetery Drilling mud …
York & High Streets Sewer Separation
Scope of Work: Install approximately 445LF of 36- to 48″ mainline storm drain pipe Support existing gas, electric, water and …
Merrimack Raw Water Transmission Main
Scope of Work: Project consisted of 7600 lineal feet of transmission water line 4000 lineal feet of reclaim asphalt Fine …
Phase 2-Etan Road/Route 120 Sewer Replacement
Scope of Work: Replacement of approximately 600LF of existing 10″ cast iron sewer pipe 48″ auger and steel sleeve under …
North West Neighborhood Sewer Separation Project
Scope of Work: 10,000 ft of stormwater drainage and associated manholes and catch basins 1,500 ft of sanitary sewer 4,500 …
York & High Streets Sewer Separation
Scope of Work: Install 6″ and 8″ Ductile Iron Water main and the York & High St Intersection Furnish and …
Plymouth Village Water and Sewer District Pump Station No. 4 FM Phase 2 and Fairgrounds Road Sewer
Scope of Work: Replacement of 4,200lf of 12″ sewer force main in same location Temporary bypass piping Replacement of existing …
Wastewater Treatment Facility Influent Box Repairs
Scope of Work: Project consisted of concrete remediation of the influent box New poured concrete in-fill to the bottom of …
Ascutney Water System Improvements
Scope of Work: New water meter monitoring building New chlorine injection and analyzing system Water line connections Site improvements and …
Waterbury WWTP
Scope of Work: General Construction contract for the construction of a new process building containing a new effluent polishing system …
Waterbury Commons
Scope of Work: Phase I of a 2 phase residential subdivision, developing the infrastructure – water, sewer, drainage, roads, electrical …
Proctor CN 4A
Scope of Work: New site access road Site work for 600,000 gal. pre-stressed concrete water storage tank Water transmission main …
Bradford Golf Course Pump Station
Scope of Work: New duplex pump station wet well, valve vault and telemetry. Project also included the abandonment of the …
Proctor Replacement Field Street Well Pump Station
Scope: Demolition of existing pump station Deep foundation, sheetpiled and dewatering systems Environmental excavation New CMU block building construction Installation …
Pittsburg Water Improvements
Scope: Construction of 50,000 Gal CIP water storage tank Installation of DI water transmission main New treatment system and booster …
Sherburne Road Waste Water Treatment Facility Upgrade
Scope: Tight site, limited access Deep excavation, shoring and dewatering systems Relocation of sewer lines and process piping Chlorine contact …
Waitsfield Community Water System
Scope: Installation of DI watermain Installation of Water meters and remote reading equipment Service lines via trenchless excavation Paving and …
Essex Junction High School Pump Station Upgrade
Scope: Demolition of existing wastewater pump station and auxiliary tanks Deep foundation, sheetpiling and well point dewatering systems Installation of …
Montpelier District Heating System
Scope: Heat Distribution pipe network encompassed 5,050 LF of trenching with dual piping, return & supply lines totaling 10,100 LF. …
Dover Waste Water Treatment Facility Refurbish
Scope of Work: New anaerobic selector Oxidation channels Massive demolition of existing structures Installation of new Lakeside equipment New headworks …
Wilgus State Park Water System
Scope of Work: Waterline installation RV dump station construction Walking path upgrades
Waitsfield Community Water System
Scope of Work: 5,000 feet of water transmission line Temporary pumping Road construction to well house Spring flooding repairs Land …
Hurricane Irene FEMA Repairs
Scope of Work: Replating backslope WWTF dike Road and stream rebuilding Slope riprapping
Troy Arsenic and Manganese Removal Facility
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Neminem videbis ita laudatum, ut artifex callidus comparandarum voluptatum diceretur. At negat …
Hinesburg Waste Water Treatment Facility Upgrade
Scope of Work: Main pump station upgrade Lagoon aeration system Chemical feed Position displacement blowers blower building construction
0.5 MG Clearwell
Scope of Work: Chemical feed system Treatment lagoons Glass-fused steel tank construction Parking lots Pre-cast process waste tanks
Blush Hill
Scope of Work: Blush Hill Reservoir watermain replacement Install new 16” water lines in recreational field under RT 100 and …
Waterbury Main Street Valve Replacement
Scope of Work: High-volume traffic Intersection traffic control 10″ water line valve replacement
Waterbury Reservoir Road Waterline
Scope of Work: Directional Drilling HPDE fusion-welded pipe Wet tap
Dover Sub-Surface Effluent Improvements
Scope of Work: Installation of cultic disposal field 5,000 feet of forcemain 30′ deep pump station and yard piping Installation …
St. George Fire District
Scope of Work: New water reservoir Chemical feed system Concrete tanks, pumping building construction
Springfield Water Works System Improvements
Scope of Work: 2000 LF of 16” ductile iron water transmission main 2700 lf 12” water transmission main 1300 lf …
Irasburg Fire District
Scope of Work: New water system Underground services Directional drilling New water/chemical feed system Cast-in-place concrete tank Pump house construction