Dolly Copp Campground

Project Overview

Location: Gorham, NH

Owner: USDA Forest Service

Engineer: White Mountain National Forest Engineering Department

Completed: 2019

Scope of Work

  • Complete US Forest Service campground reconstruction

  • Full depth roadway reconstruction

  • Installation of primary and secondary electricity

  • Rehabilitation of water tank

  • Adding a box culvert bridge

  • Extensive drainage upgrades

  • Sewer system upgrades including precast restroom facilities

  • Conversion of three toilet buildings to add shower facilities

  • Addition of a sanitary dump station

Phase 1

  • Phase 1 entails a base bid and five bid options to be completed by January 2019

  • The campground is phased into Northern and Southern components. The Northern component has reached substantial completion and the Southern component is more than 50% complete

  • Overall the project is approximately 80% complete

Safety

  • Over the duration of the one and a half year period, there have been zero accidents

Lara Dickson

ABOUT THE AUTHOR

Hailing from Vermont, USA, Lara Dickson is a ravenous Squarespace designer and enthusiast, Certified Squarespace SEO Expert, Squarespace Circle member, graphic designer, former organic vegetable and heritage breed pig farmer.

deepdishcreative.com

Previous
Previous

Corcoran’s Pond Dam Embankment Armoring

Next
Next

West Dover Waste Treatment Plant