Snowmaking Withdrawal Improvements

Project Overview

Location: Warren, VT

Owner: Sugarbush Mountain Resort, Inc.

Completed: 2022

The new dam replaces an existing dam owned and operated by Sugarbush Mountain Resort Inc., supporting seasonal snowmaking operations at Lincoln Peak, that has reached its design life and has been damaged by large storms in the past. The new dam includes modern automated controls assuring water flows support the aquatic life in the Mad River both up and downstream of the location; as well as automatically lowering during periods of high flow to allow for natural stream flows. Kingsbury Companies expects to complete this project by the winter season.

The new dam will help provide a much more reliable process for withdrawing water, maintaining the snowmaking pond during the snowmaking season and protecting the river year-round.

Lara Dickson

ABOUT THE AUTHOR

Hailing from Vermont, USA, Lara Dickson is a ravenous Squarespace designer and enthusiast, Certified Squarespace SEO Expert, Squarespace Circle member, graphic designer, former organic vegetable and heritage breed pig farmer.

deepdishcreative.com

Previous
Previous

City of Keene Aeration Project

Next
Next

AGC Award Winning, Salisbury AD1 Methane Digester