York & High Streets Sewer Separation
Project Overview
Location: Portland, ME
Owner: City of Portland
Engineers: City of Portland, ME – Public Services Dept., Engineering Section
Completed: 2017
Services: TBA
Scope of Work
Install approximately 445LF of 36- to 48″ mainline storm drain pipe
Support existing gas, electric, water and sewer utilities
Install manholes, T-bases, catch basins and associated storm drain laterals to mainline storm drain
Replacement and/or resetting of existing features impacted by construction
Full depth removal and replacement of road gravels within the pipe trenches
Full depth removal and replacement of bituminous pavement within the pipe trenches in the vicinity of York Street and High Street intersection, as shown on the plans
Pavement repairs and pavement overlay as shown on the plans for the paved access/parking area between Becky’s Diner and Gowen Marine
Reconstruct rock sea wall as necessary to accommodate new 48″ diameter storm drain outfall
Reconstruct ADA pedestrian ramps and sidewalks at three corners of the York Street and High Street intersection
Loam, seed and mulch all disturbed areas that are not directed to receive other surface treatment, including a minimum 1FT wide strip on either side of each road within the road reconstruction area