Dartmouth College Utilities PhASE 2

Project Overview

Location: Hanover, NH

Owner: Dartmouth College

Engineer: PC Construction

Completed: 2020

Installation of hot water lines, chilled water lines, communication duct banks and vaults at Dartmouth College.

Lara Dickson

ABOUT THE AUTHOR

Hailing from Vermont, USA, Lara Dickson is a ravenous Squarespace designer and enthusiast, Certified Squarespace SEO Expert, Squarespace Circle member, graphic designer, former organic vegetable and heritage breed pig farmer.

deepdishcreative.com

Previous
Previous

Merrimack River Intake Improvements

Next
Next

Whitefield Water System Improvements