Merrimack River Intake Improvements

Project OvervieW

Location: Merrimack, NH

Owner: Pennichuck Water

Engineers: Tighe & Bond

Completed: 2020

Prime Contractor. Work consisted of construction of a stainless steel intake screen and 48 inch steel intake pipe. Also, construction of a new air-burst system with a precast wet well and cast-in-place jet structure at the Merrimack River.

Lara Dickson

ABOUT THE AUTHOR

Hailing from Vermont, USA, Lara Dickson is a ravenous Squarespace designer and enthusiast, Certified Squarespace SEO Expert, Squarespace Circle member, graphic designer, former organic vegetable and heritage breed pig farmer.

deepdishcreative.com

Previous
Previous

Bennington Wastewater Treatment Plant Facility Upgrade

Next
Next

Dartmouth College Utilities PhASE 2