Mt. Carberry Gas Collection System Improvements

Project Overview

Location: Berlin, New Hampshire

Owner: Androscoggin Valley Regional Refuge Disposal District's Office

Engineers: CMA Engineers

Completed: 2018

The landfill has collection system improvements project included the expansion of the existing landfill gas collection system into recently filled areas and the active filling area of the landfill plus modifications to certain portions of the existing gas collection system. Construction included waste re-grading and the installation of horizontal and vertical gas collection wells and header pipes made of PVC & HDPE solid and perforated piping, fittings, valves, and stone trenching.

Lara Dickson

ABOUT THE AUTHOR

Hailing from Vermont, USA, Lara Dickson is a ravenous Squarespace designer and enthusiast, Certified Squarespace SEO Expert, Squarespace Circle member, graphic designer, former organic vegetable and heritage breed pig farmer.

deepdishcreative.com

Previous
Previous

Lows Lake Dam Reconstruction

Next
Next

Monroe Gate Replacement