Monroe Gate Replacement

Project OvervieW

Location: Monroe, MA

Owner: Town of Monroe

Engineers: Trinity Engineering & Tech Services

Completed: 2017

Work took place in Monroe, MA at a dam that is used for the Town’s water supply to hydrants. Kingsbury removed an existing slide gate and thimble in the dam and install a new slide gate.  Water from the brook was diverted into the overflow pipes using sandbags and sediment was removed from around the old gate in preparation for the new gate.  The gate was lowered down into place and secured using anchors and then grouted into place.

Lara Dickson

ABOUT THE AUTHOR

Hailing from Vermont, USA, Lara Dickson is a ravenous Squarespace designer and enthusiast, Certified Squarespace SEO Expert, Squarespace Circle member, graphic designer, former organic vegetable and heritage breed pig farmer.

deepdishcreative.com

Previous
Previous

Mt. Carberry Gas Collection System Improvements

Next
Next

Babbidge Dam Reconstruction