Turbine Chamber Resurfacing Project

Project OvervieW

Location: Watertown, New York

Owner: City of Watertown

Engineers: City of Watertown

Completed: 2017

The resurfacing work included removal of any loose materials, the cleaning and prep of all surfaces, and the installation of new surface material to bring the surface back to the original dimensions. The timing of the work was based on the river flow, and the availability of turbine from power production.